Confirm the requested date
SAP-feasible, above the floor and eligible under the current schedule.
KPI Optimization · Case Example
An industrial manufacturer already used SAP available-to-promise and finite scheduling. The dates were feasible—but customer feedback and an OTD rate near 89% showed that feasibility alone was not producing dependable commitments.
The purpose
SAP remains authoritative for inventory, backlog, routing, capacity and the finite production schedule. The intervention adds machine-assisted perception around that process: it detects changing conditions in operational and customer narratives, estimates how reliably each SAP-feasible date can be kept, and gives people a governed set of alternatives before the customer confirmation is issued.
Important customers: protect requested dates when probability and capacity support them.
Other customers: issue a vetted promise that is likely to be kept.
Production: prevent continuous expediting from destabilizing the schedule.
A Hybrid Cognition Forum working case
This case is intended for Forum members to examine and improve together. The present solution is an executable starting design: members can challenge the 80% floor, probability communication, CRM priority rules, planning cadence, portfolio protections, human authority and the evidence required before deployment.
The objective is practical: determine how human judgment and machine-assisted perception should be combined to improve a real KPI without shifting risk invisibly to customers or production.
The intervention
Hover to preview a stage. Select it for the full explanation.
↺ Delivery outcomes and new narratives refresh the next operating cycle.
The order-entry rule
The requested date remains visible throughout the process.
ATP and finite scheduling include backlog, material, routing and capacity.
Use the calibrated probability range and all schedule-governance gates.
SAP-feasible, above the floor and eligible under the current schedule.
Show its probability range, but confirm the earliest later vetted date the plant can responsibly keep.
No SAP-confirmed alternative currently clears the reliability and stability requirements.
Two measures remain separate: requested-date attainment is measured against what the customer asked for; confirmation OTD is measured against the firm date SAP issued.
The simulated result
In the controlled matched simulation, the complete intervention improved the KPI while preserving a common commitment floor and bounded planning cadence.
up from 89.9%
up from 88.4%
a promise the plant can keep
across 1,652 matched orders
These figures are reproducible scenario evidence, not an observed client result or deployment forecast.
The larger idea
Evidence becomes percepts; percepts form a situation model; causal interpretation produces alternatives; governed human judgment selects an action; outcomes create new evidence. The same architecture can be applied to other continuously managed performance measures.